v) Total hectarage in his name __________
vi) Survey Number(s) of the field( s )
where he wants to install the system ________________________
(Enclose a copy of Jamabundi)
vii) Has he or any of his family
members early availed subsidy
from any GOP scheme? _____________
viii) Crops cultivated _____________________________
ix) Type of system required ________________________
x) Crop for which the system is required ________________________
xi) If the system is for plantation crop then any
inter crop is taken?
xii) If, so the type(s) of inter crop ________________________
xiii) Total area under irrigation __________________________
xiv) Source of irrigation water ___________________________
xv) If wells, then open or tube well _______________________
xvi) Depth of the water table
in the well ___________________
xvii) Depth of the tube well _____________________________
xviii) Quality of the irrigation water
(Fit / Unfit) _____________
xix) Daily usage time of the well__________________________
xx) If canal then any provision made
for storage _________________________
xxi) If, yes, then the dimensions
of the reservoir (L x B x D) _______________
xxii) Any farm pond available ___________________________
xxiii) If yes the dimensions
of the pond (L x B x D) ________________________
xxiv) If there is no water source
Then what is the plan _____________________
xxv) Hrs. of electricity available daily ____________________
xxvi) Time of electricity available ________________________
xxvii) Horse power of the pump (if any) ___________________
xxviii) Horse power of the diesel engine (if any) __________________________
xxix) Dimensions of the land ____________________________
Soil is problematic or good ______________________________
xxx) Water table depth in the land ________________________
xxxi) Choice of Supply & Services Companies
a) _____________________________
b) _____________________________
c) _____________________________
It is certified that undersigned has not availed subsidy for Drip / Sprinkler under Government of Pakistan (GOP) scheme. Further, it will be allowed to any officers from Agriculture Department or any other government officials to inspect the system installed in his field any time during the 7 year period.
Signature |